3054 Homestead Drive (Fengate)

UrbanSolutions Planning & Land Development Consultants Inc. is the authorized planning consultant acting on behalf of Fengate Homestead Holdings LP, the owner of 3045 Homestead Drive. The proposed development consists of a +/- 30 hectare (+/- 75 acre) industrial subdivision comprised of five (5) industrial buildings with a combined Gross Floor Area (GFA) of 141,600.92 m2 (1,504,180 ft2) connected by a new proposed road (Street ‘A’) that is accessed via a new service road accessed off of East Cargo Road. There is proposed 950 typical parking spaces, 167 truck level doors and 26 trailer parking spaces totaling 1,143 vehicle parking spaces. The proposed uses within the subdivision include warehouses, offices and limited accessory commercial ground floor uses. In addition, there is a proposed Stormwater Management Channel and a 1.11-hectare natural heritage block. The subject lands are currently vacant as well as the area surrounding, he proposed development is generally vacant and zoned for future employment uses. To facilitate this proposal, applications were submitted to the City of Hamilton in September of 2021, to amend the Urban Hamilton Official Plan and the Zoning By-law.

The purpose of this website is to provide interested parties with access to the proposed development application details, supporting studies and access to participate in the planning process.

RESOURCES

Prior to submitting planning applications to the City of Hamilton, the development concept participated in the City’s Formal Consultation process. Through this process, it was determined that a Survey, Concept Plan, Draft Official Plan and By-law, Planning Justification Report, Urban Design Report, Archaeological Assessment, Cultural Heritage Impact Assessment, Environmentally Significant Area limit, Environmental Impact Statement, Tree Protection/ Management Plan, Stormwater Management Plan/Report, Functional Servicing Report, Noise Impact Study, Transportation Impact Study and Public Consultation Strategy Guidelines would be required to evaluate the proposal.

These reports have been completed and submitted to the City of Hamilton in support of the proposal and copies of the reports are available for you to review.

PROJECT UPDATES

April 26, 2021 – Formal Consultation application submitted to City of Hamilton.

June 16, 2021 – Formal Consultation Document issued (FC-21-077).

December 24, 2021 – Official Plan and Zoning By-law Amendment application submitted to City of Hamilton.

February 10, 2022 – Notice of Complete Application issued.

March 3, 2023 – 2nd Submission in support of 25T-202202, UHOP-22-008 & ZAC-22-017 made to City of Hamilton.

April 19, 2024 – Official Plan and Zoning By-law Amendment applications appealed to Ontario Land Tribunal (OLT) (formerly Local Planning Appeal Tribunal – LPAT) by applicant for municipalities failure to make a decision within the prescribed time period as outlined in the Planning Act.

CONTACT US

Your involvement in this application process is welcomed and encouraged. The public participated process for any development application is prescribed by the Ontario Planning Act, R.S.O., c. P.13.

For details on how to formally participate in the planning process, please contact the City of Hamilton Planner, Johnpaul Loiacono at Johnpaul.Loiacono@hamilton.ca or 905-546-2424 ext. 5134.

For more information on this project feel free to contact UrbanSolutions at comments@urbansolutions.info (or by phone at 905-546-1087)

Resource Downloads

Cover Letter

Concept Plan

Archaeological Assessment

FC Document Letter

Functional Servicing Report

DPS Application Form

Draft OPA

Draft Plan of Subdivision

Draft ZBA

OPA Mount Hope Schedule

OPAZBA Application Form

Planning Justification Report

Public Consultation Strategy Guidelines

Survey Plan

Transportation Impact Study

Tree Protection Plan

Urban Design Brief Adesso

Zoning By-law Schedule

Noise Study

OPA Airport Employment Schedule

Notice Complete Application

Cover Letter (2nd Submission)

Concept Plan (2nd Submission)

Conceptual Lane Configuration (2nd Submission)

Draft OPA (2ns Submission)

Draft Plan of Subdivision (2nd Submission)

Draft ZBA (2nd Submission)

Environmental Impact Study (2nd Submission)

Erosion Threshold Assessment (2nd Submission)

Functional Servicing Report (2nd Submission)

Hydrogeological Considerations (2nd Submission)

Landscape Plan (2nd Submission)

Noise Study (2nd Submission)

Stage 1 & 2 Arch Assessment for 9174 Airport Road (2nd Submission)

Supplementary Documentation (2nd Submission)

Transportation Impact Study (2nd Submission)

Tree Management & Protection Plan (2nd Submission)

Urban Design Brief (2nd Submission)

Watermain Hydraulic Analysis (2nd Submission)

Cover Letter (3rd Submission)

Concept Plan (3rd Submission)

Draft OPA (3rd Submission)

Draft Plan of Subdivision (3rd Submission)

Draft ZBA (3rd Submission)

Environmental Impact Study (3rd Submission)

Erosion Threshold Assessment (3rd Submission)

Functional Servicing Report (3rd Submission)

Landscape Plan (3rd Submission)

Noise Study (3rd Submission)

Preliminary Wetland Design (3rd Submission)

Riparian Rights Letter (3rd Submission)

TIS Addendum (3rd Submission)

Tree Protection & Management Plan (3rd Submission)

Urban Design Brief (3rd Submission)

Watermain Hydraulic Analysis (3rd Submission)